The Typical Demolition Plan and Process

If you thought that demolishing a building was an easy and straightforward process then read on. What is demolition? There is much more to it than simply swinging a wrecking ball at it and hoping for the best. It is commonly called demolition, but a more accurate description is deconstruction of demolishing a building . What does demolition mean? It’s a very careful demolition plan and process that must be devised for the deconstruction of old or dangerous buildings.

What is Demolition, and what does it mean?

What does demolition mean? It isn’t simply demolishing a building or structure with a wrecking ball. That would be dangerous and irresponsible. Instead, there is a demolition process and demolition plan  that requires careful planning and execution for demolishing a building. There must be an initial survey followed by a removal of hazardous materials. A what is demolition plan is then put in place and safety measures are followed.

The Demolition Process

The demolition process is broken down into parts that are outlined below. Each part has subsequent sections that contain further processes and answer what is demolition. So what does demolition mean? Let’s find out.   

Surveying – the initial stage of demolition requires a survey. There is a building survey and a structural survey. These work together to create the foundation for a safe demolishing a building process. 

Hazardous Material Removal – Hazardous Material used to create the building, such as asbestos, must be removed before demolishing a building. This protects people and the environment and follows the  demolition plan. 

Plan Preparation – a what is demolition plan is then formulated that takes account of where the building is located as well as previous survey data that can contribute to the efficient deconstruction of the edifice. 

Safety Measures – everyone involved in the demolition plan will be given full safety training. That includes an induction, emergency plans and methods to reduce noise and dust. 

Surveying

As mentioned previously surveying falls into two subcategories. There is building surveying and structural surveying. Building surveying takes account of the type of materials and insulation contained in the building and assesses whether it is hazardous or not. Structural surveying is concerned with the structure of the building and how that structure is to be safely deconstructed.

Removal of Hazardous Materials

What does demolition mean? It means removing hazardous materials, that is one of the most important preparations to make before demolishing a building. If poisonous Material like asbestos gets into the air from the falling building, it could make people sick and contaminate the surrounding environment. All hazardous materials must be identified and safely removed.

Demolition Plans

What does demolition mean? Before demolishing a building plans have to be drawn up following the initial survey. These plans are used to carry out the demolition safely and methodically. That is what is demolition. There are some key elements that need to be on the list. These are given below.

  • Location of the building
  • The distances from adjacent buildings, roads, structures and schools
  • The structural support
  • Method statements for the Demolition of the building
  • A health and safety plan showing all the measures for the protection of the public
  • Waste management plan
  • Programme of the demolition process

Safety Measures

Prior to the beginning of the demolishing a building process all workers must undergo what is demolition  induction training for safety and to understand what does demolition mean? This training will include an emergency toolbox, a discussion of safety measures and methods as well as fire safety training. Workers will also be given training on how to monitor and reduce dust, noise, and vibrations and on what does demolition mean?

Get in touch to see how we can help with your Facilities Management.

For general enquiries please fill out the form and our team will be back in touch. Or give us a call or email using the details below.

Peterborough:
01733 244414
London:
020 4538 0835
Connect with us:

Submit an enquiry